Harrison has adopted the wiring and dash as his pet project, hacking away at the rat’s nest of wiring with a pair of side cutters.
Switches all out, the operational SW gauges will be removed and sold
Floor sections are removed. Funny how many of the bolts were loose/missing. SSDutch will definitely get more use of locktite.
Not sure yet how the 4.3 will be attached to the gas pedal, so I’m keeping all the V6 sections until the engine is in.
Radiator, master cylinder/boost unit all out.
Comments are closed, but you can read the comments other people left.
jason on April 25, 2004
Michael Boyink (Author) on April 26, 2004
jason on April 26, 2004
Michael Boyink (Author) on April 26, 2004
jason on April 26, 2004